Monday, March 16, 2009

Arch Brick in Place




          These photos show the arch brick set in place and ready for the keystone to be cast.  The keystone ties the arch together and creates downward pressure on the arch brick "setting" the arch.  You can see my son Cody casting the keystone using 3000 degree F castable refractory.  Also included is a photo inside the arch form that holds the brick in place.  Once the keystone material solidifies then the arch form is removed revealing the inside of the arch.  After this the kiln's back wall and chimney will be built.

Sunday, March 15, 2009

Working on the Arch



Work on laying the arch Brick has begun and, suddenly, a snow!  My black lab Bewley was helping and she enjoyed the evening working on the kiln very much.  This is slow, steady and painstaking work. 

Monday, February 23, 2009

Arch Form in Place


The arch form is now in place and ready to receive bricks to make the chamber of the kiln.  This is a catenary arch--approximately as wide as it is tall but not a round arch form like a roman or barrel arch.  If you take a piece of string and let it drape loose it will create a catenary arch..  This arch is almost 12 feet long and three feet tall.  The form is made from a skeleton of 2" X 4"s and 3/4" front and back plywood shapes with 1/8" Masonite streached across the form and screwed into place.  Look for the bricks to define the arch next.

Saturday, February 14, 2009

Ready for the Arch


The walls that support the arch form are in place and ready to accept the wooden arch form that the bricks will be laid upon.  All is as level as I can get it and yet I find little places that vex me.  Such is the world of the brickmason.  I am trying to imagine the interior of this space filled with fire and pots glowing at a temperature of around 23oo degrees F...  Soon! 

Monday, February 2, 2009


The kiln floor is now established and the first layer of the side walls is in place.  These walls will be four bricks high before the arch begins.  I have an interesting collection of fire bricks new and used so it becomes an puzzle solvers task to find enough bricks for a course that are the same size. 

Thursday, January 29, 2009

Firebox




Now the firebox is complete up to the subfloor level.  Getting the floor on the block base and the firebox level to match up is a bit of a trick...it takes some patience and a lot of bricking up and then moving bricks.  Once all of this is level then the floor is next!

Saturday, January 24, 2009

Firebox


The firebox is being laid in front of the block base that now has a layer of firebrick on top of it.
The aluminum foil is a moisture barrier between the block and brick and between the first layer of softbrick at the base of the firebox.